This form is for Distributed Energy Resources (DERs) that meets the eligibility of a Tier II track. This includes backup fossil fuel generation, standalone energy storage systems and electric vehicles designed to provide backup service to the residence.
The Interconnection Application is to be filled out completely by the applicant or as noted in each section of the application. Section that are noted with * are required to be filled out along with bolded items.
The items below shall be included with submittal of the Interconnection Application to the Area EPS Operator. Failure to include all items will deem the Interconnection Application incomplete.
Please see Area EPS Operatorโs Technical Requirement for more details.
For Synchronous Generators 1 MW or larger, please provide the appropriate IEEE model block diagram of excitation system, governing system and power system stabilizer (PSS) in accordance with the regional reliability council criteria. A PSS may be determined to be required by applicable studies. A copy of themanufacturerโs block diagram may not be submitted.
If Yes, please only fill out the first section of EV Charger information
I designate the individual or company listed as my Application Agent to serve as my agent for the purpose of coordinating with the Area EPS Operator on my behalf throughout the interconnection process.
I hereby certify that, to the best of my knowledge, the information provided in this Interconnection Application is true and correct. I agree to abide by the Area EPS Operatorโs Interconnection Process and Technical Requirements.
ย
BY SIGNING, THE MEMBER ACKNOWLEDGES THAT THEY HAVE READ THIS AGREEMENT AND AGREE TO BE BOUND BY ITS TERMS